PLANNING December 12th Preliminary Agenda & other points of interest |
Agenda 135 Morrissey Boulevard, Southline: Presentation of updated plans for an additional wing. See slide deck HERE. This is a presentation only. This project was approved at the June 5th General Membership meeting by a vote of: Support – 16, Opposed – 3, Abstain – 1; and, at the May 10th Planning meeting by a vote of: Support – 7, Opposed – 3, Abstain – 1. Upcoming ZBA Hearings (Note corrected date for 164 Savin Hill Ave) 33 Pearl Street: (6 Units) December 5th. 26 Spring Garden: (Curb Cut) December 7th. 164 Savin Hill Avenue: (3 Units) January 9th. 9 Elton Street: (Roof Deck) January 12th. 841 Columbia Road: (6 Units) November 28th. DEFERRED to January 23, 2024. Other Project Proposals 243D Savin Hill Ave: Proponent has requested to present their proposal to build a single family home on a vacant lot on Morrissey Boulevard and Savin Hill Ave. See plans as received HERE. November 14th Planning Vote Results 9 Elton Street: Proposal to add a roof deck to a single family home as part of 3rd floor renovation. See Plans Here and Here. ZBA Date- January 12th. Support: 13 Opposed: 0 14 Victoria Street: Proposal to add a driveway beside left side of single family home. Curb cut request has also been submitted. See Plans HereSee Rendering Here Support: 11 Opposed: 1 December 12th 7pm Meeting Link: Join Zoom Meeting https://us02web.zoom.us/j/82960773880?pwd=RFdSM2xtNUJreFhGSjI5THVpcytudz09 Meeting ID: 829 6077 3880 Passcode: 868941 November 6th General Membership Vote Results 164 Savin Hill Avenue: See below for link to plans. Support: 6 Opposed: 21 Abstain: 1. There were 5 invalid votes. October 2nd General Membership Vote 33 Pearl Street: Proponents present their REVISED plans to raze existing single family home and construct a six (6) unit building with eight (8) parking spaces. See revised plans HERE, HERE, HERE & below for June 13th proposal for eight (8) units and ten (10) parking spaces. General Membership voted to recommend OPPOSITION of this proposal to the ZBA: Support 7, Opposed 14, Abstain 2. September 12th Planning Committee Meeting: VOTE RESULTS please note that due to the size of the attachments it was necessary to break-up the presentations into segments. 33 Pearl Street: Proponents present their REVISED plans to raze existing single family home and construct a six (6) unit building with eight (8) parking spaces. See revised plans HERE, HERE, HERE & below for June 13th proposal for eight (8) units and ten (10) parking spaces. The Planning Committee voted to recommend OPPOSITION of this proposal: Support 3, Opposed 7, Invalid 1. 164 Savin Hill Avenue: Proposal to gut single family to create a 3 unit building with additions to front rear and side of building, below grade parking and rear decks. See revised plans HERE, HERE, HERE, HERE, HERE, HERE & see below for four (4) unit presentation. Planning Committee voted to recommend OPPOSITION of this proposal: Support 3, Opposed 7, Abstain 1. Other Points of Interest: Dorchester Bay City – SPECIAL HYBRID GENERAL MEETING Voted to recommend SUPPORT of the proposal for a Planned Development Area on the site by a vote of 21 Support, 6 Opposed, 1 Abstain. 67-71 Sydney Street: Proposal to demolish two single family homes and construct 3 on same. See CSHCA Principles for Development Here 35-75 Morrissey Boulevard Project Page Here 710-720 Morrissey Boulevard Project Page Here 780 Morrissey Boulevard Project Page Here 800 Morrissey Boulevard Project Page Here 900 Morrissey Boulevard Project – Project Page Here. |